Wooden Bulkhead and Rip Rap North Fort Myers

Project Photos →
Black location icon on white background.

Location:

Coming Soon in Coming Soon

Black calendar icon on white background.

Install Date:

Coming Soon

Black pencil icon on white background.

Engineer:

Coming Soon

Black leaf icon on white background.

Erosion System:

Coming Soon

Project Details

When we are not able to have a large lateral footprint, we are forced to build upwards. In this case, the client wanted to hold in his shoreline above his dock, but did not have the six feet of lateral distance required for a rip rap revetment. So, we constructed a reinforced wooden bulkhead system. In a later phase, the customer had the wood coated in stucco for visual appeal. He is thrilled with the end result and his shoreline is secure.